
Industry Solution
Cranes for Mining and Bulk Materials
Material-handling systems for maintenance, bulk handling and outdoor operating areas.
Operating Conditions
Dust, material properties and outdoor duty require review
The handled material, grab selection, dust, wind, temperature and duty cycle affect mechanisms, controls and protection.
- Bulk-material transfer
- Grab handling
- Crusher and conveyor maintenance
- Outdoor yard operation
- Dust around mechanisms and controls
- Abrasive or uneven loads

Engineering Requirements
Information that shapes the crane specification
Final equipment selection depends on the real process, environment and project requirements.
- Capacity
- Project-specific; define maximum lifted load and lifting attachments.
- Span
- Clear distance and runway arrangement must be confirmed.
- Lifting Height
- Required hook travel and available building clearance.
- Duty Class
- Based on load spectrum, starts per hour and operating time.
- Travel Length
- Runway or yard travel distance.
- Power Supply
- Site voltage, frequency and phase.
- Control Method
- Pendant, remote or cabin control as required.
- Working Environment
- Indoor, outdoor, temperature, dust, moisture and chemical exposure.
Recommended Systems
Crane types commonly evaluated for this industry
Recommendations are confirmed only after the load, duty, layout and environment are reviewed.
FAQ
Project planning questions
What material data is needed for a grab crane?
Provide bulk density, particle size, moisture, abrasiveness and required handling rate.
How is dust addressed?
Enclosures, seals, cleaning access and component protection are selected according to the actual dust conditions.
Can the crane operate outdoors?
Yes, subject to wind, weather, temperature, corrosion and storm securing requirements.
Is a standard grab always suitable?
No. Grab type and volume must match the material and crane duty.
Project Enquiry
Discuss Bulk-Material Handling
Provide the load, span, lifting height, duty, layout, operating environment and applicable project requirements.
