
Industry Solution
Crane Systems for Metallurgy
Specialized material-handling systems for steel plants and metallurgical operations where heat, dust and duty require careful engineering.
Operating Conditions
Heat, dust and duty change the design basis
The handled material, temperature at the crane, process criticality and operating cycle must be confirmed before selecting the crane type and protection.
- High ambient or radiant temperature
- Dust and scale around mechanisms
- Frequent operation and demanding load spectrum
- Critical process handling
- Maintenance access above production equipment
- Special lifting attachments where verified

Engineering Requirements
Information that shapes the crane specification
Final equipment selection depends on the real process, environment and project requirements.
- Handled Material
- Ladle, coil, billet, scrap, equipment or other verified load.
- Temperature
- Ambient, radiant and load temperature at the crane.
- Duty
- Load spectrum, cycles per hour and annual operating time.
- Capacity & Span
- Maximum load, runway span and hook coverage.
- Protection
- Heat shields, protected cabling or enclosures as required.
- Control
- Cabin, remote or pendant according to visibility and process.
- Redundancy
- Only where required by the process and applicable rules.
- Inspection
- Project-defined testing and documentation.
Recommended Systems
Crane types commonly evaluated for this industry
Recommendations are confirmed only after the load, duty, layout and environment are reviewed.
Metallurgical Overhead Cranes
Specialized configurations for verified metallurgy applications.
Electromagnetic or Grab Systems
Only after the handled material and attachment are confirmed.
FAQ
Project planning questions
What temperature data is required?
Provide ambient temperature, radiant heat, load temperature and the expected exposure at mechanisms and electrical equipment.
Does every steel-plant crane require the same configuration?
No. Requirements differ for ladle handling, scrap, coil, billet, maintenance and general workshop service.
How is duty determined?
Duty is based on load spectrum, operating cycles, working time and process criticality.
Can cabin control be provided?
Cabin control may be configured where process visibility and operating practice require it.
Project Enquiry
Discuss a Metallurgy Crane Requirement
Provide the load, span, lifting height, duty, layout, operating environment and applicable project requirements.
